Title: Approval of Addition of Projects to the 2023-2028 Capital Investment Program
Attachments: 1. Agenda Memo, 2. Attachment A: Fund Impacts, 3. Attachment B: Reservoir Park Water Tank Repairs Project Info Sheet, 4. Attachment C: Bellevue Joint Use NE 40th Transfer Switch PIS, 5. Attachment D: Fire Station 17 Siding Replacement Project Info Sheet

TO: Members of the City Council

FROM: Mayor Angela Birney

DEPARTMENT DIRECTOR CONTACT(S):

Public Works

Aaron Bert

425-556-2786

 

DEPARTMENT STAFF:

Public Works

Tess Wilkinson

Capital Projects Planner

Public Works

Seven Gibbs

Acting Capital Division Manager

 

 

TITLE:

title

Approval of Addition of Projects to the 2023-2028 Capital Investment Program

 

OVERVIEW STATEMENT:

recommendation

Public Works is seeking changes to the existing 2023-2028 CIP and is requesting Council add the following projects to the approved CIP: Reservoir Park Water Tank Repairs, Bellevue Joint Use 40th Reservoir Transfer Switch, and Fire Station 17 Siding Replacement.

body

  Additional Background Information/Description of Proposal Attached

 

 

REQUESTED ACTION:

 

  Receive Information                                            Provide Direction                                            Approve

 

 

REQUEST RATIONALE:

 

                     Relevant Plans/Policies:

CIP Proviso

                     Required:

N/A

                     Council Request:

N/A

                     Other Key Facts:

N/A

 

 

OUTCOMES:

These CIP additions are necessary to align the capital delivery workplan and expected spending with the appropriate approved funding sources.

 

                     Reservoir Park Water Tank Repairs: The water tank is located under the tennis/pickleball courts at Reservoir Park on NE 95th St. Because of the upcoming sports court replacement at the park, an inspection and structural analysis of the water tank was performed. The tank was determined to be structurally sound but in need of a new liner. Changes to site drainage around the tank were also recommended. This project will repair identified deficiencies with the existing water tank. The estimated project cost is $735,000 and will be funded out of the Water CIP fund balance.

 

                     Bellevue Joint Use 40th Reservoir Transfer Switch: The 40th St. Reservoir is jointly owned with the City of Bellevue. In our joint use agreement for this facility, Bellevue is responsible for overseeing the maintenance and operation of this reservoir. It was discovered by Bellevue through routine maintenance inspections that an emergency power switch needs to be replaced. All work will be managed by Bellevue. Redmond’s portion of the costs for this project is $102,000 which will be funded out of the Water CIP fund balance.

 

                     Fire Station 17 Siding Replacement: During routine inspection, Facilities staff discovered moisture intrusion behind the siding of the building which is causing the siding to fail. Facilities staff is recommending replacement of the siding to prevent further damage to the building envelope. Work on this project will include replacement of weather barrier, flashing and the removal and replacement of the exterior siding. Estimated cost is $1,119,620 and will be funded out of Real Estate Excise Tax (REET).

 

 

COMMUNITY/STAKEHOLDER OUTREACH AND INVOLVEMENT:

 

                     Timeline (previous or planned):

N/A

                     Outreach Methods and Results:

N/A

                     Feedback Summary:

N/A

 

 

BUDGET IMPACT:

 

Total Cost:

$1,956,620

 

Approved in current biennial budget:                                            Yes                                            No                                            N/A

 

Budget Offer Number:

CIP

 

Budget Priority:

Healthy and Sustainable

Safe and Resilient

 

Other budget impacts or additional costs:                       Yes                                            No                                            N/A

If yes, explain:

N/A

 

Funding source(s):

General Government, Water CIP

 

Budget/Funding Constraints:

N/A

 

  Additional budget details attached

 

 

COUNCIL REVIEW:

 

Previous Contact(s)

Date

Meeting

Requested Action

1/9/2024

Committee of the Whole - Finance, Administration, and Communications

Provide Direction

 

Proposed Upcoming Contact(s)

Date

Meeting

Requested Action

N/A

None proposed at this time

N/A

 

Time Constraints:

All budget adjustments for the 2023-2024 biennium must be approved no later than December 31, 2024.

 

 

ANTICIPATED RESULT IF NOT APPROVED:

If new projects are not approved, the delay in critical repairs to Fire Station 17 could result in further damage to the building. The schedule for replacement of Reservoir Park’s sports court would also be impacted, causing the courts to remain closed longer than anticipated.

 

 

ATTACHMENTS:

Attachment A - Fund Impacts

Attachment B - Reservoir Park Water Tank Repairs Project Info Sheet

Attachment C - Bellevue Joint Use 40th Reservoir Transfer Switch Project Info Sheet

Attachment D - Fire Station 17 Siding Replacement Project Info Sheet