File #: AM No. 26-A077   
Type: Consent Item Status: Agenda Ready
File created: 2/23/2026 In control: City Council
On agenda: 3/17/2026 Final action:
Title: Approval of a Consultant Agreement with OTAK, in the Amount of $207,958, for the Connection to King County Wastewater System - Avondale Way
Attachments: 1. Attachment A: Project Information Sheet, 2. Attachment B: Consultant Contract

TO: Members of the City Council

FROM: Mayor Angela Birney

DEPARTMENT DIRECTOR CONTACT(S):

Public Works

Aaron Bert

425-556-2786

 

DEPARTMENT STAFF:

Public Works

Lisa Rigg

Senior Engineer

Public Works

Deepali Jodh

Senior Project Manager

Public Works

Chris Stenger

Deputy Public Works Director

Public Works

Steve Gibbs

Capital Projects Division Manger

 

 

TITLE:

title

Approval of a Consultant Agreement with OTAK, in the Amount of $207,958, for the Connection to King County Wastewater System - Avondale Way

 

OVERVIEW STATEMENT:

recommendation

Public Works is requesting approval of a consultant agreement with OTAK in the amount of $207,958.  This agreement is for design services for the Connection to King County Wastewater System - Avondale Way, which will replace 20 lineal feet of existing 18” reinforced concrete pipe with 27” reinforced concrete pipe. The work will include a new saddle manhole at the connection point with the King County Trunk, and abandonment of the existing connection.

 

Three consultants were selected from the MRSC roster for Engineering Services to submit proposals. Two proposals were received, and OTAK’s proposal was rated the highest. Scope and budget were then developed with OTAK to move forward.

 

body

  Additional Background Information/Description of Proposal Attached

 

 

REQUESTED ACTION:

 

  Receive Information                                            Provide Direction                                            Approve

 

 

REQUEST RATIONALE:

 

                     Relevant Plans/Policies:

General Sewer Plan

Community Strategic Plan - Objective #1:

Invest in infrastructure preservation and replacement across the city to maintain the current level of service, the reliability of capital assets and provide timely and cost-effective replacement.

 

                     Required:

Council approval is required to award an Architectural and Engineering Services agreement that exceeds $50,000 (2018 City Resolution 1503).

                     Council Request:

N/A

                     Other Key Facts:

N/A

 

 

OUTCOMES:

The project will increase the undersized section of pipe in the Avondale Wastewater Conveyance that connects to the King County Wastewater Trunk. This improvement will accommodate existing and future flows (using buildout of existing zoning) without causing surcharging in the upstream manholes.

 

 

COMMUNITY/STAKEHOLDER OUTREACH AND INVOLVEMENT:

 

                     Timeline (previous or planned):

N/A

                     Outreach Methods and Results:

N/A

                     Feedback Summary:

N/A

 

 

BUDGET IMPACT:

 

Total Cost:

$1,090,664

 

Approved in current biennial budget:                                            Yes                                            No                                            N/A

 

Budget Offer Number:

CIP

 

Budget Priority:

Healthy and Sustainable

 

Other budget impacts or additional costs:                       Yes                                            No                                            N/A

If yes, explain:

N/A

 

Funding source(s):

Wastewater CIP

 

Budget/Funding Constraints:

N/A

 

  Additional budget details attached

 

 

COUNCIL REVIEW:

 

Previous Contact(s)

Date

Meeting

Requested Action

3/3/2026

Committee of the Whole - Planning and Public Works

Provide Direction

 

Proposed Upcoming Contact(s)

Date

Meeting

Requested Action

 

 

Time Constraints:

N/A

 

 

ANTICIPATED RESULT IF NOT APPROVED:

Not approving the design contract affects the anticipated city project timeline for construction and the completion of this project would be delayed according to CIP budget documents.

 

 

ATTACHMENTS:

Attachment A: CIP Project Information Sheet

Attachment B: OTAK Consultant Agreement