Title: Approval of Award of Bid to Olson Brothers Excavating, Inc. of Puyallup, Washington, in the Amount of $591,173.00 for the Construction of the Mackey Creek Restoration Project No. 20021402
Attachments: 1. Agenda Memo No. 18-106, 2. Attachment A: Vicinity Map

MEMO TO:                     Members of the City Council

FROM:                     Mayor John Marchione

SUBJECT:                     


title

Approval of Award of Bid to Olson Brothers Excavating, Inc. of Puyallup, Washington, in the Amount of $591,173.00 for the Construction of the Mackey Creek Restoration Project No. 20021402

 

I.                     RECOMMENDED ACTION

recommendation


Award bid for the Mackey Creek Restoration Project No. 20021402 to Olson Brothers Excavating, Inc. of Puyallup, Washington for the amount bid of
$591,173.00 and authorize the Mayor to sign the agreement.

body

II.                     DEPARTMENT CONTACTS

 

Martin Pastucha, Director of Public Works                                                                                    425-556-2733

Mike Paul, City Engineer                                                                                                                              425-556-2721

Bassam Al-Ali, Project Manager                                                                                                         425-556-2743

 

III.                     DESCRIPTION/BACKGROUND

 

Project purpose:

This project will enhance Mackey Creek and its associated riparian and wetland habitat by removing fish passage barriers, reducing sediment deposition/erosion problems and restoring more diverse stream habitats, managing invasive species, and enhancing native plant communities.

 

Project Description

This portion of Mackey Creek runs through Farrell-McWhirter Park. This project will re-align approximately 700 lineal feet of the main stem of Mackey Creek and stabilize the creek with large woody materials and habitat boulders to encourage formation of habitat features along the main stem and throughout the creek. The project also includes eradicating 1.6 acres of invasive Reed Canary Grass and planting native vegetation along the creek.

 

Project Background

In 2014, through a request for proposal (RFP) process, Tetra Tech, Inc. was chosen as the successful consulting firm. The first phase of work documented critical areas in Farrell-McWhirter Park. The original agreement with Tetra Tech included the option to add additional services for future phases of work via supplemental agreements, including design and permitting of stream and wetland enhancements, and other Park improvements, such as creating a Park Master Plan and replacing a restroom facility.

 

In 2015, following the identification of critical areas in the park, a supplemental agreement with Tetra Tech was approved by Council to design and permit the stream and wetland enhancement project. The design proceeded to 60%, and state and federal permits were submitted in mid-2016. The City received the Army Corps  of Engineers permit in March 2018, and worked with Tetra Tech to finish design, specs and cost estimate in May 2018. The project will be constructed in August-September 2018.

 

Additional Funds

The project requires additional funds to construct the project. There are several contributing reasons for the increased cost of the project. During project design development it was determined that the project would not be successful unless the scope was expanded to include additional work upstream and downstream as well as replace an undersized  culvert. The Army Corps of Engineers (COE) Nationwide 27 Permit took 20 months to receive, which was significantly longer than the expected 9-month time period. The permitting delay resulted in additional project administration and construction escalation costs that were not included in the original budget. In addition, additional design work was needed to address comments received from the COE, Washington Department of Fish and Wildlife and Tribes. The additional costs are summarized below.

 

                     Escalation of original project estimate from 2015-2018: $147,082

                     Added scope items to address regulatory agency requirements and additional upstream and downstream work: $195,860

                     Additional administration and overhead from project start: $25,000

                     Additional design for fish passage and channel design: $22,000

 

Bid Results

The project was advertised in the Daily Journal of Commerce on May 23, 2018. The City Clerk received bids until 2 PM, June 7, 2018.

 

There were five bidders and the bids are summarized below:

 

Bidder

Location

Amount Bid

Olson Brothers Excavating, Inc

Puyallup

$591,173.00

EcoGrind Site Solutions LLC

Chewelah

$739,860.00

Mike McClung Construction Co

Buckley

$799,705.50

Razz Construction Inc.

Bellingham

$883,234.00

A-1 Landscaping and Construction, Inc.

Snohomish

$1,232,352.00

 

Engineers Estimate  

$791,656.80

 

All bidder’s unit prices, extensions and additions have been checked for accuracy and unbalanced bid items.

 

The staff recommends award to Olson Brothers Excavating, Inc. the lowest and responsive bidder. The contractor references were checked and found to be acceptable. Olson Brothers Excavating, Inc. successfully completed the Perrigo Park Expansion in 2015.

 

IV.                     PREVIOUS DISCUSSIONS HELD

 

Planning and Public Works Committee                     Design                                                                                    1/13/2015

City Council                                                                                                         Design                                                                                    6/16/2015

Planning and Public Works Committee                     Update                                                                                    5/08/2018

 

V.                     IMPACT

 

A.                     Service/Delivery:

 

This project will enhance Mackey Creek and wetlands in Farrel-McWhirter Park by removing fish passage barriers, reducing channel erosion and sediment deposition problems, restoring more diverse stream habitat, reducing flooding, enhancing native plant communities and removing invasive plant species.

 

B.                     Fiscal Note:

 

Estimated costs for the project are shown below.

 

Current project Budget:

Storm CIP funds:                                                                                       $770,000

King Conservation District Funds:                                             $130,000

 

Total Funding                                                                                                            $900,000

 

Estimated project Costs:

Design Phase                                                                                                            $538,314

Construction Phase                                                                                       $751,628

Total Estimated Project Cost                                                               $1,289,942

 

Budget                                                                                                                                ($389,942)

Shortfall Transfer from Stormwater CIP

 

VI.                     ALTERNATIVES TO STAFF RECOMMENDATION

 

The City Council could choose not to award the contract which would delay the project construction, and flooding problems and habitat degradation would continue.

 

VII.                     TIME CONSTRAINTS

 

Begin Construction                 August 2018

Complete Construction          September 2018

 

VIII.                     LIST OF ATTACHMENTS

 

Attachment A: Vicinity Map