File #: AM No. 18-137   
Type: Consent Item Status: Passed
File created: 8/27/2018 In control: City Council
On agenda: 9/18/2018 Final action: 9/18/2018
Title: Approval of Consultant Agreement with BHC Consultants, L.L.C. in the Amount of $912,000 for Design and Construction Services for Wastewater Pump Station No. 13 Replacement, Project No. 20021809
Attachments: 1. Agenda Memo No. 18-137, 2. Attachment A: Vicinity Map, 3. Attachment B: Agreement

MEMO TO:                     Members of the City Council

FROM:                     Mayor John Marchione

SUBJECT:                     


title

Approval of Consultant Agreement with BHC Consultants, L.L.C. in the Amount of $912,000 for Design and Construction Services for Wastewater Pump Station No. 13 Replacement, Project No. 20021809

 

I.                     RECOMMENDED ACTION

recommendation


Approve the consultant agreement with BHC Consultants, L.L.C. in the amount of $912,000 for design and construction services for Wastewater Pump Station No. 13 Replacement, Project No. 20021809, and authorize the Mayor to sign the agreement.

body

II.                     DEPARTMENT CONTACTS

 

Martin Pastucha, Director of Public Works                                                               425-556-2733

Mike Paul, City Engineer                                                                                                         425-556-2721

Mike Haley, Project Manager                                                                                                         425-556-2843

 

III.                     DESCRIPTION/BACKGROUND

 

Project Purpose

The City has identified Wastewater Pump Station No. 13 is in need of replacement as a part of the Capital Improvement Program. 

 

Project Background

Wastewater Pump Station No. 13 was built in 1985 to provide wastewater conveyance for a large area of the Marymoor Business Park.  The existing station age and equipment are beyond their useful life and need to be replaced. The pump station has been scheduled for rehabilitation in the Wastewater CIP.

 

In 2017, the Marymoor Subarea (Business Park) was rezoned from light industrial to a combination of multi-family and commercial. The new zoning requires the pump station system capability to be increased from 675 gallons per minute to a size capable of pumping 2,000 gallons per minute peak wastewater flow.  The new wastewater pump system is scheduled to be complete before flows from the rezoned area exceed the capacity of the existing wastewater pump system.

 

Project Description

This project will design a replacement for Wastewater Pump Station No. 13 with a new station capable of pumping 2,000 gallons per minute of wastewater into a new 12-inch force main along 176th Ave NE and NE 70th St that will discharge to the King County wastewater collector.   Approximately 1400 feet of gravity sewer will also be replaced when the new force main is installed.  The pump station design and construction work will include replacement of pumps, controls, electrical panel, standby power, valves, piping, addition of safety equipment, and other items identified during design.  The new station will be located in an existing easement adjacent to the existing pump station on the Lake Washington Institute of Technology site that is currently in use by the City of Redmond as the Redmond Community Center at Marymoor Village.

 

The original 2016 cost estimate for the pump station rehabilitation assumed the station would be rehabilitated in the existing location to serve the existing neighborhood with no increase in capacity.  The project is now scoped to serve a rezoned Marymoor Subarea (Business Park) that will require a much larger pump station with sufficient capacity to serve the fully redeveloped neighborhood.  This has resulted in a significant increase in estimated project costs.  The following highlights a few of the significant reasons for the project cost estimate increase of - $10.75 million

• New larger pump station - $6.4 Million

• New larger force main and gravity collection system - $1.5 million 

• High Risk Contingency - $2.6 million

• Cost escalation from 2015 to 2018 - $0.25 Million

 

Consultant Selection Process

As part of the consultant selection process, three (3) firms were selected from the City’s consultant roster and invited to submit proposals. The firms were:

 

BHC Consultants, LLC                      Seattle WA

Murry Smith and Associates                     Seattle WA

HDR Inc.                                                               Bellevue WA

                     

Two firms responded and delivered proposals. The City’s selection team evaluated the proposals and determined that BHC Consultants, L.L.C. was the most qualified firm to provide design and construction services for this project. 

 

After selection, negotiations were held to finalize the scope of work and to determine a fair and reasonable cost for this work.  The scope and fee have been incorporated into the City’s Standard Consultant Agreement (Attachment B).

 

Consultant Agreement

This agreement will allow BHC to design the Wastewater Pump Station No. 13 replacement. 

 

IV.                     PREVIOUS DISCUSSIONS HELD

 

Council Actions / Communication

Date

Action / Committee Presentation

9/11/2018

Planning and Public WorksCommittee

Today

Approve Consultant Agreement

 

 

V.                     IMPACT

 

A.                     Service/Delivery:

 

This project will replace an aging wastewater pumping station.  The replacement of this station will assure continuation of service to the rezoned Marymoor Subarea neighborhood.  This agreement includes the preparation of construction plans, specifications, cost estimates and engineering services during construction.

 

B.                     Fiscal Note:

 

A.                     Estimated costs for the project are shown below.

                                          Current Project Budget:

                                          Wastewater CIP                                                                                                                              $3,500,000

                                          Total Funding                                                                                                                                                   $3,500,000

                                          Estimated Project Costs:

                                          Preliminary Design Phase                                                                                                         $1,618,000

                                          Design                      Phase                                                                                                                                                   $1,965,000                     

                                          Construction                      Phase                                                                                                                   $10,668,000

                                          Total Estimated Project Cost                                                                                              $14,251,000

                                          Budget Difference*                                                                                                                  ($10,751,000)

                                          From Wastewater CIP                                                                                                                    $10,751,000

                                          *The City anticipates bond proceeds will be needed to complete the project.

The additional cost for the upsized pump station will be paid for through an assessment placed upon new development to pay for the upgraded systems required to address the additional wastewater flow capacity.

 

VI.                     ALTERNATIVES TO STAFF RECOMMENDATION

 

The City Council may choose not to approve the consultant agreement for the design of the project; however, this action would delay the completion of this project.

 

VII.                     TIME CONSTRAINTS

 

Target Dates                                          

Wastewater Pump Station No. 13 - Start design October 2018

Wastewater Pump Station No. 13 - Start construction December 2019

 

 