Title: Approval of a Consultant Agreement with RH2 Engineering, in an Amount Not-to-Exceed $247,761, for the 10000 Block of Avondale Erosion at Bear Creek, Project No. 20021807
Attachments: 1. Agenda Memo No. 19-089, 2. Attachment A: Vicinity Map and Photos, 3. Attachment B: Consultant Agreement

MEMO TO:                     Members of the City Council

FROM:                     Mayor John Marchione

SUBJECT:                     


title

Approval of a Consultant Agreement with RH2 Engineering, in an Amount Not-to-Exceed $247,761, for the 10000 Block of Avondale Erosion at Bear Creek, Project No. 20021807

 

I.                     RECOMMENDED ACTION

recommendation


Approve a consultant agreement with RH2 Engineering for alternatives analysis, preliminary design, and permitting services for the 10000 Avondale Road Erosion at Bear Creek, Project No. 20021807, in an amount not-to-exceed $247,761 and authorize the Mayor to sign the Agreement.  Authorize staff to secure property rights necessary to construct and maintain the project. 

body

II.                     DEPARTMENT CONTACTS

 

Kristi Wilson, Interim Public Works Director                                                                                    425-556-2529

Gary Schimek, P.E., EUSD Manager                                                                                                                              425-556-2742

Emily Flanagan, P.E., Functional Area Lead PW / EUSD                                                               425-556-2707

Adnan Shabir, P.E., Project Manager PW                                                                                                         425-556-2724

 

III.                     DESCRIPTION/BACKGROUND

 

Bear Creek is migrating into the Avondale Road roadway embankment north of Novelty Hill Road. Significant erosion has occurred at the slope toe, causing settlement of the embankment and resulting in minor sidewalk undercutting.  The creek migration has also damaged two stormwater outfalls.  It is estimated that the creek has laterally migrated about 90 feet from its 1936 location.

Bear Creek is a critical part of WRIA8’s Chinook Recovery plan, so one of this project’s primary focus will need to be improving the instream habitat of this reach.  The project has the dual purpose of repairing the Avondale Road embankment and providing an environmental improvement to Bear Creek. 

Because of this dual goal, the project will be funded by both Transportation and the Stormwater Capital Improvement Program budgets.  Funding has been budgeted in the CIP for design and construction.

Process to Date

                     The erosion was identified by City staff in 2017.  In the Spring of 2018 a consultant team was hired under the On-Call agreement to review available data and determine if an emergency fix was required. The consultant determined that is was not an emergency, but that monitoring should be conducted.

                     The slope has been monitored with regular survey since summer 2018, through an on-call agreement.

                     Early 2019 the City initiated the project and advertised for the alternatives analysis, permitting, and preliminary design work.  City staff have selected RH2 Engineering to do the work and are currently scoping the contract.

                     May 2019 the consultant agreement was brought before the Planning and Public Works Committee of the Whole.  It was approved for consent agenda for June 4, 2019 Council meeting

 

IV.                     PREVIOUS DISCUSSIONS HELD

 

COUNCIL ACTIONS/COMMUNICATION

Date (MM/DD/YYYY)

Action / Committee Presentation

06/12/2018

Informed Council at the June 2018 Planning and Public Works Committee of the Whole meeting of the identified problem and informed them an On-Call consultant was being hired to investigate.

05/14/2019

Public Works and Planning Committee

Today

Approve Consultant Agreement

 

 

V.                     IMPACT

 

A.                     Service/Delivery:

 

Avondale Road has an average daily traffic count over 30,000 vehicles.  It is a key arterial into town.  Not protecting it could lead to loss of use and significant traffic impacts

 

B.                     Fiscal Note:

 

                                          Current Project Budget:

                                          Stormwater CIP                     $436,000

                                          Transportation CIP                     $436,000

                                          Total Funding                                          $872,000

                                          Costs:

                                          Preliminary Design Phase                     $247,761

 

VI.                     ALTERNATIVES TO STAFF RECOMMENDATION

 

None.  Avondale Road is a key arterial into Redmond; not approving this preliminary design work could lead to loss of use and significant traffic impacts.

 

VII.                     TIME CONSTRAINTS

 

Though the project is being monitored and not treated as an emergency, it is still urgent that we protect this embankment.  The permitting process is lengthy for work in Bear Creek, so we are pushing to submit permits quickly

 