City of Redmond Logo
File #: AM No. 19-095   
Type: Consent Item Status: Passed
File created: 5/13/2019 In control: City Council
On agenda: 6/18/2019 Final action: 6/18/2019
Title: Award of Bid to Olson Brothers Excavating, Inc. of Puyallup, Washington, in the Amount Bid of $485,573, for Construction of the Bear Creek at 95th Street Stream Enhancement Project No. 20021406
Attachments: 1. Agenda Memo No. 19-095, 2. Attachment A: Project Map
MEMO TO: Members of the City Council
FROM: Mayor John Marchione
SUBJECT:

title
Award of Bid to Olson Brothers Excavating, Inc. of Puyallup, Washington, in the Amount Bid of $485,573, for Construction of the Bear Creek at 95th Street Stream Enhancement Project No. 20021406


I. RECOMMENDED ACTION
recommendation

Approval of Award of Bid for the Bear Creek at 95th street Stream Enhancement Project No. 20021406 to Olson Brothers Excavating, Inc. of Puyallup, Washington for the amount bid of $ 485,573 and authorize the Mayor to sign the agreement.
body

II. DEPARTMENT CONTACTS

Maxine Whattam, Interim Director of Public Works 425-556-2310
Gary Schimek, Interim City Engineer 425-556-2742
Tom Hardy, Stream and Habitat Planner 425-556-2762
Bassam Al-Ali, Project Manager 425-556-2743

III. DESCRIPTION/BACKGROUND

Project Purpose:
To install woody material, regrade creek banks to create backwater channels and alcoves, and revegetation of the surrounding wetlands and open areas.

Project description:
The project area is situated on Bear Creek directly south of NE 95th Street. The project is approximately 1.7 miles northeast of downtown Redmond.

The project will install 6 multi-log structures, create multiple alcoves, two backwater channels and a bank notch, in a 500-foot reach of Bear Creek downstream of NE 95th Street bridge. The project will also remove invasive vegetation off approximately 2 acres of riparian area which will be planted with native trees and shrubs. Half of the enhancements are designated as mitigation for the extended life of the NE 95th St. bridge (to be replaced by 2024), and half of the enhancements are voluntary of critical Chinook habitat.




Bid Results

The project was advertised in the Daily Journal of Commerce on May 15 and May 22, 2019. The City Clerk received bids until 2 pm, on May 30, 2019.

There were (6) bidders and the bids are summarized below:

BIDDER LOCATION AMOUNT BID
Olson Brothers Excavating Inc Puyallup $48...

Click here for full text