TO: Members of the City Council
FROM: Mayor Angela Birney
DEPARTMENT DIRECTOR CONTACT(S):
Public Works |
Dave Juarez |
425-556-2733 |
Planning and Community Development |
Carol Helland |
425-556-2107 |
DEPARTMENT STAFF:
Planning and Community Development |
Jason Lynch |
Assistant Director of Development Services |
Planning and Community Development |
Joe Johnson |
Construction Inspection Supervisor |
Public Works |
Paul Cho |
Traffic Operations Manager |
Public Works |
Adnan Shabir |
Senior Engineer |
TITLE:
title
Approval of the 170th Ave NE Road Closure for Penny Lane Development Sewer Line Work
OVERVIEW STATEMENT:
recommendation
Penny Lane is Private Development townhome construction project adjacent to 170th Ave NE. As part of the project, improvements in the roadway include an update to the sewer line on 170th Ave NE. The sewer line is situated in the middle of the roadway and requires deep excavation. The Contractor was given approval by City Council to close the roadway in lieu of using steel trench plates.
We are currently seeking an extension of the previously approved road closure for the Penny Lane project as the work is taking longer than originally planned. The approved road closure expires Friday, June 11th. The sandy soils are creating sluff, which is slowing the current process, the contractor has an additional 200 feet of sewer line to install and are expecting construction to take an additional 20-25 days to complete.
Construction activity would take place between 7AM-7PM Monday through Friday with potential of Saturday work. Approval for full road closures is required from Council per RMC 10.24.047.
body
☒ Additional Background Information/Description of Proposal Attached
REQUESTED ACTION:
☐ Receive Information ☐ Provide Direction ☒ Approve
REQUEST RATIONALE:
• Relevant Plans/Policies:
N/A
• Required:
Council approval is required for full road closures per RMC 10.24.047
• Council Request:
N/A
• Other Key Facts:
The Contractor is currently performing this work and is experiencing delays due to the soils that result in sluffing. There have been no reported complaints during the initial road closure.
OUTCOMES:
Closing the roadway will greatly increase the efficiency of the sewer line installation work, reduce the overall days to complete the work. Prior correspondence with adjacent residents supports closing the roadway due to these reasons.
COMMUNITY/STAKEHOLDER OUTREACH AND INVOLVEMENT:
• Timeline (previous or planned):
Informing adjacent residents of the road closure.
• Outreach Methods and Results:
Notification to adjacent residents of the road closure will go out if this request is approved. Traffic alert notifications will go out through the City’s traffic alert map.
Detour signage will be placed directing motorists to alternate routes, access to residents will be maintained.
Notice of the road closure will be published in a local newspaper.
• Feedback Summary:
N/A
BUDGET IMPACT:
Total Cost:
N/A
Approved in current biennial budget: ☐ Yes ☐ No ☒ N/A
Budget Offer Number:
N/A
Budget Priority:
N/A
Other budget impacts or additional costs: ☐ Yes ☐ No ☒ N/A
If yes, explain:
N/A
Funding source(s):
N/A
Budget/Funding Constraints:
N/A
☐ Additional budget details attached
COUNCIL REVIEW:
Previous Contact(s)
Date |
Meeting |
Requested Action |
5/11/2021 |
Committee of the Whole - Planning and Public Works |
Approve |
5/18/2021 |
Business Meeting |
Approve |
Proposed Upcoming Contact(s)
Date |
Meeting |
Requested Action |
6/15/2021 |
Business Meeting |
Approve |
Time Constraints:
The deep excavation for the sewer line requires it to be done during dry summer months. Contractor has also started the sewer work with limited work hours per day with the sewer bypassed via a temporary pipe. It will be important to complete the sewer connection and disconnect temporary bypass lines to reduce risk of sewer leaks.
ANTICIPATED RESULT IF NOT APPROVED:
Increased working days for work completion would result in additional disruption to residents and require use of the temporary sewer line for longer duration. A full road closure also ensures vehicular traffic is prohibited in the work zone, reducing noise and risk to the Public.
ATTACHMENTS:
Attachment A: 170th Ave NE Closure and Detour
Attachment B: 170th Ave NE Closure Vicinity Map