AM No. 23-089
| 1. | Consent Item | Adoption of a Resolution Amending the City Fee Schedule to Include Fees for Electric Vehicle Charging
a. Resolution No. 1573: A Resolution of the City Council of the City of Redmond, Washington, Adopting a Fee Structure for City-Owned, Publicly Available, Electric Vehicle Charging Infrastructure | referred | |
Action details
|
Not available
|
SS 23-036
| 2. | Study Session | Status Check-in on the Transportation Master Plan Update | referred | |
Action details
|
Not available
|
AM No. 23-094
| 3. | Public Hearing | Adoption of the Annual Update of 2024-2029 Six-Year Transportation Improvement Program (TIP)
1. Resolution No. 1574: A Resolution of the City Council of the City of Redmond, Washington, Adopting a Six-Year Transportation Improvement Program for the Years 2024-2029 and Directing the Same to be Filed with the State Secretary of Transportation and the Transportation Improvement Board | referred | |
Action details
|
Not available
|
AM No. 23-077
| 4. | Consent Item | Acceptance of the Sound Transit System Access Grant for 156th Ave Cycle Track Project | referred | |
Action details
|
Not available
|
AM No. 23-A552
| 5. | Consent Item | Approval of On Call Agreements with Intertek PSI, Krazan and MTC for Material Testing and Special Inspection Services, in an Amount Not to Exceed $300,000 per Firm | referred | |
Action details
|
Not available
|
AM No. 23-072
| 6. | Consent Item | Approval of the Puget Sound Regional Council (PSRC) Federal Grant, in the Amount of $865,000, for the Adaptive Signals Downtown Project and to Add the Project to the 2023-2024 CIP | referred | |
Action details
|
Not available
|
AM No. 23-088
| 7. | Consent Item | Approval of an On-call Monitoring Capacity Contract Increase, in the Amount of $80,000, in Support of the Surface Water Monitoring Program | referred | |
Action details
|
Not available
|
AM No. 23-073
| 8. | Consent Item | Approval of a Supplemental Agreement to Existing On Call Agreements with OTAK for Engineering and Inspection Services for Wastewater Lift Stations and Other CIP Projects | referred | |
Action details
|
Not available
|
AM No. 23-075
| 9. | Consent Item | Approval of the 2021-23 Pollution Prevention Assistance Interagency Agreement Amendment with the Washington State Department of Ecology | referred | |
Action details
|
Not available
|
AM No. 23-076
| 10. | Consent Item | Approval of a Consultant Agreement with Matrix Consulting Group, in the Amount of $170,300, for the 2023 Fleet Study | referred | |
Action details
|
Not available
|
SS 23-034
| 11. | Study Session | Consultant Agreement with HDR for the NE 95th Street Bridge Replacement Project | referred | |
Action details
|
Not available
|